The CNC cutter has been resized to be large enough to cut the winglets (ooooooooooooo fancy), and that means we can finally get these chunks of foam out of the way.
Thursday, November 19, 2015
Friday, August 14, 2015
8/14/15
Wow. I'm halfway through instrument flying to get my Private, then I'm ready for the checkride. And I've still been working on the Long!
The aileron trough on the Left wing was layed down today. 3 plies BID with an extra ply over the aileron hinge attach points. I was able to get it finished before I went to work.

Also, in order to fill my X-Country requirements, I flew to Mineral Wells to meet my dad for lunch. I also swung by to see his Quickie project.







His is a little closer to flying than mine.
The aileron trough on the Left wing was layed down today. 3 plies BID with an extra ply over the aileron hinge attach points. I was able to get it finished before I went to work.

Also, in order to fill my X-Country requirements, I flew to Mineral Wells to meet my dad for lunch. I also swung by to see his Quickie project.







His is a little closer to flying than mine.
Saturday, August 1, 2015
Tuesday, July 28, 2015
Tuesday, July 14, 2015
Monday, June 29, 2015
6/29
Did layups 5 and 6 on the wing today, 2 plies UND over the wing attach bolt hole and 3 plies to cover the outer inboard recess. Remanufactured the CS128 bellhorn for the third time and finally got it within good tolerance.



I start my new job tomorrow. Solo'd in a 172 today and I'll continue working on my license. When I'm not flying or working, I'll carve out the inboard FC3 recess, then cut the ailerons and install hardware to finish the second wing. Easier said than done.



I start my new job tomorrow. Solo'd in a 172 today and I'll continue working on my license. When I'm not flying or working, I'll carve out the inboard FC3 recess, then cut the ailerons and install hardware to finish the second wing. Easier said than done.
Friday, March 27, 2015
Subscribe to:
Posts (Atom)






