Saturday, February 14, 2015

2/14/15

Laid the bottom spar cap in an hour exactly! What an improvement from 2 hours on the right wing!


Tuesday, February 10, 2015

2/9/15

The wing needs to lay flat in order to layup the spar cap. My mom poked a hole in her shirt when she helped flip it.


Sunday, February 8, 2015

2/8/15

The right wing was in the way and it needed to be moved. We loaded it up and took it to the garage where we keep the big, completed pieces (spar, main gear, and canard). It all fits nicely on the side of the garage.




Saturday, January 17, 2015

Left Wing Shear Web

Laid the shear web for the left wing in 3.5 hours. That's 1.5 hours less than it took us on the right wing! Our handiwork looks a little better too.

Monday, January 12, 2015

New Nose Bulkheads

I've been looking through other build logs for awhile. I've also known that I want to cut off the unfinished nose to replace it with a longer one. Ary J. Glantz's modification is my favorite, and he included the templates on his site to boot!

The two bulkheads and the baby NG-30s were all glasses on one side with BID tonight. They'll receive the same on the other side as well.

Monday, January 5, 2015

Below the shear web

LWA4's, LWA6, and W18's are attached to wing over access hole. I went ahead and cut the shear web glass, and I covered them with a garbage bag to make sure no dust gets to it.